US 24 (Mile Point 34.2 – 34.5): Road construction.

Between N 100 W and S 75 W (near Reynolds). Road construction work is in progress. Bridge construction work is in progress. Expect single line traffic alternating directions.

White County B -44020 Road will be reduced to one lane utilizing a temporary traffic signal. This is an active contract.

US 24 (Mile Point 39.7 – 40.4): Lane closed.

Between S 400 E and 6th St. (near Monticello), a lane is closed. Utility work is in prog- ress. Watch for flaggers. Until April 26, at about 5 p.m. EDT.

Comment: Work taking place along the south side of US HWY 24 between CR 425 E and 6th St Monticello with lane restriction, no detour.

US 24 (Mile Point 47.4 – 47.5): Lane closed.

Between Logan St. and Cross St. in Idaville, a lane is closed. Utility work is in progress. Look out for flaggers, until April 6, at about 5 p.m. EDT.

Comment: NIPSCO crews will excavate in the right of way on East State Highway 24. (1) 4X4 bell hole approximately 5 feet deep. The purpose of the project is to retire gas service and perform general maintenance with lane restriction, no detour.

IN 18 (Mile Point 34.1): Bridge construction.

Between S 150 W and S 1100 W (near Brookston), bridge construction work is in progress until May 31, at about 6 p.m. EDT.

Comment: One-way traffic with temporary signals is in use to maintain traffic. There is speed reduction in the construction zone. Be prepared to

IN 43 in both directions (Mile Point 30.5 – 36.4): Construction work.

Between IN 225 (near Battle Ground) and IN 18, Brookston, look out for construction work. There are alternating lane closures. There is a width limit in effect. Width limit 11’0”, until May 13, at about 6 a.m. EDT.

STARTS April 1. US 24 (Mile Point 35.1 – 35.6): Road closed to traffic.

Between IN 43; US 421 and W 100 S (near Reynolds). Road closed to traffic. Starting April 1, at 12 a.m. EDT until June 15, at about 11:59 p.m. EDT.

Comment: US 24 westbound and eastbound lanes, east of IN 43, will be closed to thru traffic from April 1 to June 15. The official road closure detour route for US 24 WB traffic will start in Dunkirk and take traffic south on US 35 until they reach IN 25. From there traffic will take South IN 25 all the way to Interstate 65 and will head north on Interstate 65 until they reach the Exit for IN 43. Once on IN 43 traffic will go north until they reach US 24 in Reynolds. The detour route for EB traffic will start in Reynolds and take traffic south on IN 43 all the way to Interstate 65. From there traffic will go south on Interstate 65 until the IN 25 exit where they will take IN 25 North until they reach US 35. Once on US 35 they will head north until they reach US 24 in Dunkirk.

STARTS April 1. US 421 (Mile Point 160.4 – 160.5): Work on the shoulder.

Between Oak Dr. and Dodge Rd. in Monticello, work on the shoulder begins April 1, at 7 a.m. EDT until April 25, at about 5 p.m. EDT.

Comment: Roundabout Construction. US 421, between Oak Dr. and Dodge Rd., there is work on the shoulder, starting April 1, until April 25. Pipe and structures are being installed. There will be occasional overnight flagging as pipe is installed across SR 39/US 421. There are several phases to this project and more information will be added as phasing progresses. Project completion date is Nov. 15, 2024. Any questions call 855-INDOT4U.

STARTS APRIL 9. IN 43 (Mile Point 38.2 – 38.7): Bridge construction.

Between 900 S (1 mile north of the Brookston area) and Evans Rd (1 mile south of the Chalmers area), bridge construction begins. The bridge will be closed, starting April 9, at 6:30 a.m. EDT until May 11, at about 8 p.m. EDT.